Greenfield data hall for a global cloud platform
Owner's-representative and commissioning partner for a greenfield hyperscale data hall in one of the fastest-growing US cloud regions — energized on schedule.

A global cloud platform was building greenfield capacity in a fast-growing Midwest market where speed to energization is everything. They needed independent owner-side oversight to protect schedule, budget, and technical intent across designers, contractors, and the utility — and a commissioning program that would prove the facility before load arrived.
We acted as the owner's representative from design review through energization — coordinating the utility interconnection, holding contractors to the schedule, and defending the design intent against value-engineering that would have eroded resilience. Our commissioning team then proved every system, so the platform inherited a facility that was verified, liquid-ready, and ready for load.
What we delivered
Owner's representation
Independent oversight of design, schedule, budget, and technical intent.
Utility coordination
Interconnection and energization sequencing with the utility.
Liquid-ready design
Mechanical systems staged for future direct-to-chip cooling.
Commissioning
Integrated systems testing and verified handover before load.
The result